CR03 Close
up showing the twin drum cutter set. A 150-millimetre suction pipe
is placed between the drum cutters. The excavated soil or gravel
is being sucked out from the trench together with the bentonite
slurry. The slurry is then pumped to the bentonite treatment plant
where the soil and gravel are removed by a filtration process.
|