CEC02 The
this photo from September 1995, progress can be seen in the
southern part of the building. The reinforced concrete core, which
was constructed in stepped sections using a patented shuttering
system, functioned efficiently after a three-month period of
continual work. Some of the steel trusses for the floor structure
of the Level 2 Exhibition Hall, including the first two pairs of
supporting columns, was installed. To reduce construction costs,
the floor slab of Level 1 Exhibition Hall was constructed of
reinforced concrete (rather than structural steel) as there was no
need to provide a large-span design for the ground floor area.
|