CEC04 In
February 1996, less than 10 months from the commencement of the
main building structure, the first section of the main roof truss
was in position. The three levels of the Exhibition Hall, with the
floor slab for Level 1 made of reinforced concrete, and Level 2
and 3 of structural steel construction, can be clearly seen in
this photo.
|