CEC04

In February 1996, less than 10 months from the commencement of the main building structure, the first section of the main roof truss was in position. The three levels of the Exhibition Hall, with the floor slab for Level 1 made of reinforced concrete, and Level 2 and 3 of structural steel construction, can be clearly seen in this photo.