TKO15

Cut-and-cover tunnel between Tseung Kwan O Station and Hang Hau Station   
The eastbound tunnel linking the depot and Tseung Kwan O Station is located very close to the temporary seawall where tidal control provisions are required prior excavation work. Necessary realignment and temporary diversion has to be carried out during tunnel excavation