TKO15
Cut-and-cover
tunnel between Tseung Kwan O Station and Hang Hau Station
The
eastbound tunnel linking the depot and Tseung Kwan O Station is located
very close to the temporary seawall where tidal control provisions are
required prior excavation work. Necessary realignment and temporary diversion
has to be carried out during tunnel excavation
|