R3K06

The most magnificent section of Route 3. Essentially, the whole construction process can be seen here. In the upper right corner, the segment launcher has lifted the precast beams on the portal frame to form the bridge deck. The precast beams in the centre of the photo have been tightened on the frame by the use of tensioning, and thus, the temporary steel clips have been removed. The bridge deck on the left has had the reinforcement fixed. On the far left side, concrete placing to the bridge deck can be seen