R3K23

The first box-section beam of the Airport Railway has been placed on top of the pier as the starting member. Hydraulic jacks will then be used to adjust the beam to form the final alignment and gradient of the bridge deck. Finally, when the beam has been tightened by steel tendons, the lifting of other members within the section can be carried out